It's mostly together now. I'll finish leveling, installing the backsplash, DRO and connecting the power cables when it's moved into its final position. I still have to move my workbench as it's where the lathe will go. I got it all done by myself before my help was available. The 2-ton hoist was way better for this job! Time to call the electrician!
Chip tray...
Tony
Chip tray...
Tony