- Joined
- Jun 12, 2014
- Messages
- 5,127
Not sure what you mean, the RPC needs to be up and running for a short period (comes up to full speed) before turning on the power to 3 phase equipment. At some point the electrician should check the line to line voltage (not to ground or neutral), I would have assumed he would have run everything before leaving.