- Joined
- Jan 30, 2013
- Messages
- 32
Hi wanted to share some pictures of the new mill. It came fully assembled to the base in a wooden box that barely fit through the 7' high garage door. I set it against the wall, leveled it and it was time to figure out some storage area. I built three shelves to fit behind it. I did notice the gear box oil filled the sight glass and I read in the PM45 area that some of these were over filled so I drained some oil out and did the break-in and changed the oil. The only thing I found to this point is I had to tap the lift motor to get it to run? It works all the time now.