I was in an oddly similar situation. I ordered an AXA-4D in December in order to build an ER-40 chuck. Waited a couple weeks and emailed, got the two weeks out story. Waited a month and emailed again (which was this Tuesday) Still two weeks out, but I was given the option to switch to the AXA-4. I received it yesterday.
I would have preferred the 4D, but the bar is in the lathe drilled and ready to bore.
According to the Aloris rep, the machine that makes AXA-4D's is down, expected back up two weeks from now.
I would have preferred the 4D, but the bar is in the lathe drilled and ready to bore.
According to the Aloris rep, the machine that makes AXA-4D's is down, expected back up two weeks from now.