- Joined
- Jul 14, 2013
- Messages
- 198
Looks worse than a wood shop! Although a dust collection system would probably be helpful in your shop.Actually project of the week. Been making piles of UHMW chips! 312 lid brackets for a cargo carrier, each with 7 separate operations. Each operation takes anywhere from 1 to 6 minutes. You guys were talking about production work, I too hate production work, but it pays pretty good. These started out as as three 48 x 96 x 1 1/4 sheets. About 30 hours on the router just to cut them out. About 46 hours to get to this point. Still have about 20 hours left to finish.
Thought I would snap these before I cleaned up for the next operation
View attachment 121920
About 4 inches deep on the right side, about a foot deep on the left. The good news is that these chips vacuum up very easy.
View attachment 121921
Putting a 5 inch radius on the bottom, 4 pieces at a time. The toggle clamps were not quite enough to hold them, so add c-clamps.
View attachment 121922 View attachment 121923
Sent from my SM-T217S using Tapatalk