playing with more copper,, started work on the exhaust header pipe,, besides the engine the boiler feed pump exhaust into the pipe, It also will have a fitting where the vacuum gauge attaches.. cero-bend used to get nice bends, left the cero-bend in the small piece while milling the joint end with a ball-end mill. got the main joint soldered, seems to have got it correct..