1/6th scale 1890's 30ft navy steam cutter (live steam)

the forward set with their angled backs that fit the hull frames were soldered up and shaped today, now to get some lathe time making the sheaves. (they are all the same)
 

Attachments

  • IMGP0027.JPG
    IMGP0027.JPG
    346.8 KB · Views: 15
  • IMGP0028.JPG
    IMGP0028.JPG
    396.2 KB · Views: 14
made the small pair of cable guides that help get the cables around the curves of the hull,, sort of down in the jewelry range of metal work.. most of the steering gear is complete..
 

Attachments

  • IMGP0036.JPG
    IMGP0036.JPG
    514.9 KB · Views: 9
  • IMGP0037.JPG
    IMGP0037.JPG
    500.1 KB · Views: 9
used string to get the steering gear in its correct positions, machined up some little bits that with small wedges will lock the cables in place..
 

Attachments

  • IMGP0027 (2).JPG
    IMGP0027 (2).JPG
    374.1 KB · Views: 14
  • IMGP0028 (2).JPG
    IMGP0028 (2).JPG
    403.2 KB · Views: 11
  • IMGP0030 (2).JPG
    IMGP0030 (2).JPG
    324.8 KB · Views: 11
  • thumbnail_PXL_20231009_165641159.jpg
    thumbnail_PXL_20231009_165641159.jpg
    211.7 KB · Views: 13
another day another part,, decided to add a hanger bracket for the aft end of the steering shaft.. not in the navy plans but will allow to get the steering cables all rigged before installing the forward bulkheads.. wheel and drum assembly spins nicely..
 

Attachments

  • IMGP0031.JPG
    IMGP0031.JPG
    310.4 KB · Views: 13
  • IMGP0032.JPG
    IMGP0032.JPG
    416.1 KB · Views: 13
waited for materials, did some small stuff during the time,, stuff arrived built the steering cable gear,, rigged but not locked in place yet..
 

Attachments

  • IMGP0024 (2).JPG
    IMGP0024 (2).JPG
    350.5 KB · Views: 16
  • IMGP0062.JPG
    IMGP0062.JPG
    419 KB · Views: 16
  • IMGP0068.JPG
    IMGP0068.JPG
    381.7 KB · Views: 16
  • IMGP0070.JPG
    IMGP0070.JPG
    470.9 KB · Views: 15
  • IMGP0072.JPG
    IMGP0072.JPG
    372.5 KB · Views: 16
  • IMGP0074.JPG
    IMGP0074.JPG
    389.9 KB · Views: 15
set up the new fire bricks and decided to have a go at soldering the boiler base parts together.. just kind of followed the ring around and then flipped it to the other ring,, need to rivet and solder the feet..
 

Attachments

  • IMGP0006.JPG
    IMGP0006.JPG
    435.9 KB · Views: 12
  • IMGP0007.JPG
    IMGP0007.JPG
    422.6 KB · Views: 11
base feet soldered and riveted in place,, made alignment pins from screws and mounted them in the boiler support rails,, rails lagged to frames,, washers, springs and hitch pins finish the job,,
 

Attachments

  • IMGP0016.JPG
    IMGP0016.JPG
    343.1 KB · Views: 14
  • IMGP0012.JPG
    IMGP0012.JPG
    404.1 KB · Views: 13
  • IMGP0013.JPG
    IMGP0013.JPG
    405.6 KB · Views: 13
  • IMGP0020.JPG
    IMGP0020.JPG
    383.3 KB · Views: 13
  • IMGP0018.JPG
    IMGP0018.JPG
    441.5 KB · Views: 14
a stock servo gearbox for steering would not fit,, so started throwing lots of aluminum chips to build one,, 5 turn servo + 12 tooth drive gear +60 tooth main gear.. I should get a 360 degrees at the shaft,, lots of power and not to fast..
 

Attachments

  • IMGP0039.JPG
    IMGP0039.JPG
    356.9 KB · Views: 15
  • IMGP0041.JPG
    IMGP0041.JPG
    365.2 KB · Views: 15
  • IMGP0040.JPG
    IMGP0040.JPG
    386.5 KB · Views: 15
Back
Top