- Joined
- Mar 1, 2015
- Messages
- 71
I have placed order for my PM 935 TV , its 8-12 weeks out, be hard to wait that long but I can survive it if my 1340GT would arrive soon, its said to be at the docks waiting to be unloaded. then add 1-2 wks. for me to go pick up, I have to schedule a vacation day few weeks out just to have my position covered.
I went with the variable speed model so I can save time when going from one job or process to the next, did not want to rewire whole machine as I will need to do with 1340gt. I will need to ask more questions on hooking up the Hitachi VFD . it worries me that I must take out factory wiring to complete hook up of VFD.. what if I don't get it right and thencant figure out how to get original wiring back installed?
Can I use lathe as is just by running feed through the VFD to 3ph motor a is. then maybe do the rest of the variable speed wiring at later time?
I went with the variable speed model so I can save time when going from one job or process to the next, did not want to rewire whole machine as I will need to do with 1340gt. I will need to ask more questions on hooking up the Hitachi VFD . it worries me that I must take out factory wiring to complete hook up of VFD.. what if I don't get it right and thencant figure out how to get original wiring back installed?
Can I use lathe as is just by running feed through the VFD to 3ph motor a is. then maybe do the rest of the variable speed wiring at later time?