- Joined
- Oct 16, 2019
- Messages
- 6,852
Well done, I like the clamp storage @C-BagI finally got over what I have come to call my “project horizon” and could see my way to the end of the basic frame build. When I made the top frame of some old 1x2 channel I’d been hauling around for the last 15yrs, I realized I needed a new top. I found a top off a school table I’d bought and it was close to the right size. It also had a sheetmetal cubby underneath I thought would make a good tub for the tanks to sit in. I realized after cutting down the tub I’d let my yearning to use my sheetmetal tools cloud my thinking and lead me down a rabbit hole that wouldn’t be good over the long run. It really was only sheetmetal.
Why not just use the bottle cart they lived in and wouldn’t have a use for if they weren’t in it? Too simple. Cut off the wheels, handle and junk box and it fit right into welding cart frame. Made a extension for the third bottle (ox, acetylene, CO2) bottle and the rest of the frame came into metal view. I still need to go back and treat the rusted channel and clean up the welds. But after so much fiddling I couldn’t wait to slap it all together.
Are the machines held down in any way? I'd hate to see one tip off if it got seriously bumped.