- Joined
- Aug 6, 2015
- Messages
- 4,208
I will have a company do the insulation in there... I am not installing the ceiling panels. I will have someone do that.Uh-oh... d00d, you returned the insulation before lining either the roof or ceiling?
After electrical is done and the walls are covered, I will hire someone to do the ceiling. Then hire a company to do the insulation there. Pretty sure they will do that with a pump. So there was no need to keep the leftover insulation I had.
Last edited: