Nice work on the base/feet !I got the base finished and mounted. Oil line replacement is done. Table is back in place. Tomorrow I will level the machine and tram the head. Next comes the DRO install and X Axis motor drive install.
View attachment 410987
The vise is great. No complaints.Excellent!
I had to look that brand of vise up, never heard of it before. Let us know how you like it.
Right. And the 3x5 sits on 2x5 which sits on the leveling feet. I'm 6'1" so I elevated it about 7 inches.You used 3/16 wall 3x5 rectangular tubing for your base? Thought that was what your drawing showed. Love you base design
I though the same hahaIs that a workshop or a museum?