- Joined
- Sep 22, 2010
- Messages
- 7,220
In this photo, the column (middle- about 350 pounds), goes on the base casting (top-about 450 pounds),
the ram (bottom-about 225 pounds) goes on the column, and a heavy spindle motor (not shown-about 80 pounds) goes at the top.
An engine crane will not lift the ram and motor high enough to place it on the column, and space for the crane is very limited.
I cannot do something across the joists, there are water, gas, and steam pipes across the joists in this area (see pics below).
Here is the basement ceiling in the shop.
How do I get these lifted? I do NOT weld.
I would need a fixture made of metal BOLTED together or made of wood, attached with bolts (maybe a wood gantry of 4x4's?)
The HF gantry is too large and also expensive.
Thanks,
:tiphat:Nelson
PS I have 3- 10' 2x10 planks left over from the ramp I made to slide this heavy iron down the basement steps.