II just wanted to get a feel on everyones opinion. I checked on my parts which includes all of the indexing crank pieces which are parts 32-36. I can do most of the parts right from the start however my concern is the milling work. I cant get to doing the milling work atleast until maybe end of june depending on the weather. Now is everyone ok if with that amount of waiting time possibly if it does get held up on my side? I dont mind doing the work, in fact i want to do it but if it is a problem i understand then.