There's nothing like the weekend to mess up your schedule. The plans to have the little niva up together ready to drive come and went but i did manage to get couple of things done, first i determine which pipes and tubing i'll use to make the new suspension links, the round pipe is seamless, roll cage material very thick wall staff, the lower suspensions links are first things to get damaged when off roading so i plan made them from the biggest strongest square tubing i could buy. Then i realised i don't have a piece for panhard bar so i drove to my metal supplier and bought me a piece. When i got back i started planning, i drill and tap couple of holes in my table so i can bolt down the ends in the right spots then come the part that i hate that is shaping the ends to match the curves of the bushing ends so it will have more surface area to be welded on. By the time i got finished with the third bar it was almost midnight so i stoped.