Today i spent good amount of time on making the new panhard bar. Started in the machine shop, chucked the tubing and bored face and chamfer the end. Then i worked on the insert for it, drilled, threaded then cut down to the bored tubing size, i made it a press fit. Then i started on the adjuster, cut down the 30mm hex to 20mm and used M20x1.5 threading die, that way i can make adjustment every half turn or 0,75mm. Then i machined two more bushing ends and took them all to the big garage. There i assembled them and welded them, i waited for them to cool down a bit, give them a quick sending and painted it first primer then same top color as the other 4 suspension links.