War Time South Bend Lathe

Nice lathe Bob,hope your plan will be like Brian's start/finish so please post so we can follow along.I did a lathe like that couple yrs ago and that cabinet is a project in itself.
 
I also have a USN lathe. Mine was used by GE in Ft. Wayne In. during the war. 1941 Heavy 10L...Bob

Hello Bob :)

That's neat to see another "war" lathe. It's interesting to note that your stamp is different than mine, in relation to the US Navy. Mine is a '43 model and simply has the US with the anchor.

Brian
 
A 6" vise is overkill for a RF45 style mill. A 4" is more appropiate for that size mill & IMO 5" max. I have a 5" GMT vise on my PM45 & it's slightly too big. Not enough Y axis travel to make use of the 5" full capacity. Better to save your money rather than getting something too big & most importantly the weight. I take my vise of the table quite often, a 6" is still light enough for me to be carried by hand but I'm glad I have a 5". I also have a 4" vise as well. I prefer the 5" though.

But those GMT 6" Premium vises are pretty nice. I'd love to have one but don't need one on my current mill. But if you plan on upgrading to a full size knee mill in the future than the 6" will be perfect.


Here's what the 5" looks like on my mill.
Img_1921.jpg


I couldn't even complete this cut without my bellows & DRO scale getting in the way. Not enough Y travel & the 5" vise is not even maxed out.
Img_7597_zpscb8b5dd7.jpg


Here's what a 6" vise looks like on another PM45 (gt40's)
View attachment 253544
 
A 6" vise is overkill for a RF45 style mill. A 4" is more appropiate for that size mill & IMO 5" max. I have a 5" GMT vise on my PM45 & it's slightly too big. Not enough Y axis travel to make use of the 5" full capacity. Better to save your money rather than getting something too big & most importantly the weight. I take my vise of the table quite often, a 6" is still light enough for me to be carried by hand but I'm glad I have a 5". I also have a 4" vise as well. I prefer the 5" though.

But those GMT 6" Premium vises are pretty nice. I'd love to have one but don't need one on my current mill. But if you plan on upgrading to a full size knee mill in the future than the 6" will be perfect.


Here's what the 5" looks like on my mill.
Img_1921.jpg


I couldn't even complete this cut without my bellows & DRO scale getting in the way. Not enough Y travel & the 5" vise is not even maxed out.
Img_7597_zpscb8b5dd7.jpg


Here's what a 6" vise looks like on another PM45 (gt40's)
View attachment 253544
 
wow, thanks for all the pictures!
it is appreciated.
-brino
 
Just got in from work,put in 1/2 day.Wife made me a ham sandwich so I grab my laptop went straight to Brians post.Who would have ever though that reading about 5/16 or 3/8 bolt would be so fantastic but it is.That is perfect,notice the slight dome head to match.This is one of those threads that new owners of SB lathe will go to for learning and lot of inspiration.
 
A 6" vise is overkill for a RF45 style mill. A 4" is more appropiate for that size mill & IMO 5" max. I have a 5" GMT vise on my PM45 & it's slightly too big. Not enough Y axis travel to make use of the 5" full capacity. Better to save your money rather than getting something too big & most importantly the weight. I take my vise of the table quite often, a 6" is still light enough for me to be carried by hand but I'm glad I have a 5". I also have a 4" vise as well. I prefer the 5" though.

But those GMT 6" Premium vises are pretty nice. I'd love to have one but don't need one on my current mill. But if you plan on upgrading to a full size knee mill in the future than the 6" will be perfect.


Here's what the 5" looks like on my mill.
Img_1921.jpg


I couldn't even complete this cut without my bellows & DRO scale getting in the way. Not enough Y travel & the 5" vise is not even maxed out.
Img_7597_zpscb8b5dd7.jpg


Here's what a 6" vise looks like on another PM45 (gt40's)
View attachment 253544
 
Back
Top