- Joined
- Mar 3, 2017
- Messages
- 804
It looks like it had a 220 3ph.
Going to change to a 220 1ph or 110.
If you have the 3phase motor, a VFD drive box will run the lathe on your 220 1ph. The
reversibility and speed control are big win, over anything in a 1ph motor.