They have 50 base machines ready to ship now. Around June 25th for mine. Backordered because of the DRO. The feed motor also backordered until early August.Congrats! When does it arrive?
Do any of you guys have a picture of the control board or can you see your control board mine is filled with black plastic for security purposes? I just got my mill 3 weeks ago and the terminal blocks where these wires are look a bit differentYeah....I had a small fire in my terminal box up on motor from loose wires. I found two wires crimped differently on either end so it was wired backwards(spindle direction) a bit of a mess. I'm gonna say it's A PSA to all PM owners to at least up the electrical boxes and take a gander.
The black "plastic" that you are referring to is called "potting". It is actually an epoxy that is poured into/onto the circuit board. It can serve two purposes... 1.) In a higher vibration environment it reduces the chances of components coming loose or breaking off. 2.) Some mfg's do it to force you to buy a new board vs repair should something go wrong.Do any of you guys have a picture of the control board or can you see your control board mine is filled with black plastic for security purposes? I just got my mill 3 weeks ago and the terminal blocks where these wires are look a bit different