- Joined
- Jan 23, 2015
- Messages
- 26
I know someone else who was getting parts from the same guy (for the PM-940 though) and it was "almost done, should be next week" for like 8 months...
Paul's PM-30 kit was delivered a few days ago. It is a new kit and there has been a back order for the units. It is new so getting them out takes more time than a kit like the PM-25 that I have been making for years.
A example of a little thing is the couplers. I had been using 30mm couplers and most of the steppers had 1/2" or 3/8" shafts 25mm long. Well now everyone want the closed loop or servos that have longer 14mm shafts. The would not work without cutting the shafts with the 30mm couplers.
I ordered 35mm couplers but they have a really long wait time. So I re did all the drive size mounts to take 40mm couplers which are easier to get.
Re doing all the parts to get that fixed does take time.
The kit is now shipping and I can do 35mm or 40mm couplers and Nema 23 or 34 for the X and Y and all the couplers are in hand.
Just a example of one little thing that makes shipping a kit not so easy.
The PM940 is much the same story. It is now regularly shipping. 8 months ago would have been the first or second kit. I made each part one at a time and a few changes needed to be made. Now I'm mostly ramped up for both the kits.
Thanks
Dave AKA arizonavideo99