PM 1340GT delivery and setup

Whew, my first real milling project. Learnt a bunch. Also made mistake of not tightening y axis on mill so there is 0.05" unnecessary gap at bottom. Made sure that top of T nut is slightly recessed from the compound surface so QCTP is sitting tight.

Btw what is the difference between 201 and 202 tool holders?
aebd88fc91c82223ac4ae0199209e3b3.jpg
5f28f52ce84ca03ae0423b99525f3922.jpg


Sent from my ONEPLUS A5010 using Tapatalk

Well done, good job.
 
So the compound had one holding nut broken when I got the lathe. PM said they will send some down the line but I could not wait as I was getting chatter doing concave radius with large tool contact.

So at first I tig welded the broken but, sanded and also ran a m8-1.25 tap through it to clear any obstruction. But then I could not figure out how to insert that nut without needing to get the cross slide out from back. It seemed like I needed to get the back cover of the lathe out, way too much work. So I built a round nut that I can insert from top through the opening. It went well but then I realized nothing is stopping that nut from spinning so could not tighten. Then I tig welded a small flange to one side, lol. Seems to work well now but I wonder what the correct process is to insert a proper nut.
7e03a986c5c85fcc21e0bd636eecd1b5.jpg
e58b999c58ed075a04201d595c5e0b1a.jpg
2591c3a712cfdc0e88c8ad476117bddf.jpg


Sent from my ONEPLUS A5010 using Tapatalk
 
Back
Top