Latest work - Got the 4/0, 4/0, 2/0, 4 MHF wire into 2.5" conduit and long elbows and up out of the trench in the new shop, also got it in conduit at the house and wired into the 200amp disconnect.
Also got the Cat6 in conduit and ran in the house and into the shop.
I did the CSST flex gas connection at the existing shop the other day so that leaves me with getting that terminated in the new shop as the last trench related work. After that work on filling the trenches some more and fixing my landscaping I moved to dig the trench.