M6-25M Extension bracket and enough confusion to last the day...

Spindle is 32T
Tumbler is 20-24-32T
end or position "A" is 36 Back 20 front
Position "B" is also the attachment point for the M6-25M extension bracket.
"B" is 20T back (spacer) 40T front (idler)
position "C" is 44T back 46T front
Gear on screw is 54T in the back position.
Lead is of course 16/in

Of curious note this setup will move away from the chuck in normal "forward" rotation when the half nuts are engaged. (the extra gear in the chain)
*edit: I suppose this is what the reverse tumbler is for,right? (du'oh)

I'm stealing time where I can. I did get a scratch pass in last night but was not able to measure it. I'll be doing that shortly .
 
Last edited:
Back
Top