- Joined
- Oct 17, 2012
- Messages
- 126
Sorry I was not succinct. Look at post #3. Great protractor.
Insert a ground bar into tail stock.
take a Sterret 47 bevel similar to darkzero's and perform the transfer like I did.
measure to the ground bar and the tool post.
Perform the same procedure I did. Use that bevel to measure. If this isn't enough I'll draw a sketch.
same principle. Read my first 2 posts again, only substitute the Sterret in lieu on the Bridge City if you can't find one.
get the compound parallel to the cross slide.
mike
Insert a ground bar into tail stock.
take a Sterret 47 bevel similar to darkzero's and perform the transfer like I did.
measure to the ground bar and the tool post.
Perform the same procedure I did. Use that bevel to measure. If this isn't enough I'll draw a sketch.
same principle. Read my first 2 posts again, only substitute the Sterret in lieu on the Bridge City if you can't find one.
get the compound parallel to the cross slide.
mike