- Joined
- Dec 28, 2012
- Messages
- 22
OK, here she is
After several months of only being able to work on it one day a week, we can finally say she is 99.5% done. Waiting on some Tygon tubing to use for the flood coolant but I am VERY excited to say all went well. I haven't made a video yet but will do so prior to the first milled part. I'll post a link here when it is available. A HUGE..HUGE thank you to Jumps for making this project possible...
Tom
After several months of only being able to work on it one day a week, we can finally say she is 99.5% done. Waiting on some Tygon tubing to use for the flood coolant but I am VERY excited to say all went well. I haven't made a video yet but will do so prior to the first milled part. I'll post a link here when it is available. A HUGE..HUGE thank you to Jumps for making this project possible...
Tom
Last edited by a moderator: