I spent yesterday on cad designing a lathe stand so not a shop project yet. Construction is mostly 2x2x.120 wall tubing and is designed around a HF 44" top box for storage. I'll need to remove the lid but that shouldn't be too hard. I went to HF to get the measurements, I have the bottom box and they are very good quality for the price, better than my older Craftsman tool boxes. I incorporated 2 shelves at the headstock end for larger items like chucks. Not sure if I'm going to add a door or not yet. It looks like 40' of tubing and several pieces of 10 gage that I'll get plasma cut along with the two 1/2" thick mount plates for the lathe. I plan on welding out the complete stand before setting the two mount plates in place, that will minimize the effects of any distortion due to the welding. I'd love to get those surfaces milled flat after the stand is fully welded but that sounds like too much money for me so I'll just be very careful on my setup and use minimal weld. I'll do a full build thread once I get started. Next up is a trip to the metal supplier.
View attachment 120581
View attachment 120582