Did you make it vertical for a reason? Some friends and I are looking to make one so was wondering.

Jeff

Inspired yet again by another member's post (I should stop read the project of the day, it creates too many distractions), I had been pottering around in the evenings last week with making a soft hammer which I finished this weekend by blackening the body and handle - which was really just an excuse to try out the micro forge I had thrown together while waiting for materials for mini forge (propane bottle size).


And the forge
View attachment 96236
 
Did you make it vertical for a reason? Some friends and I are looking to make one so was wondering.

Jeff

The micro forge one I actually made to be horizontal so it can be laid down and with the jug handle on the ground the weight of the burner will hold it steady. But I was just heating up some stuff to blacken it so using it vertical allowed me to dangle stuff in it on a wire then pull it out and straight into the oil.

The one I am planning to build out of a propane tank will be vertical as I want to use that with a crucible for casting aluminium, at the same time a friend is building one that will be horizontal as he wants to us it for forging knives.
 
The micro forge one I actually made to be horizontal so it can be laid down and with the jug handle on the ground the weight of the burner will hold it steady. But I was just heating up some stuff to blacken it so using it vertical allowed me to dangle stuff in it on a wire then pull it out and straight into the oil.

The one I am planning to build out of a propane tank will be vertical as I want to use that with a crucible for casting aluminium, at the same time a friend is building one that will be horizontal as he wants to us it for forging knives.
 
A pressing project for the day.

Had to press the ''C's'' off of a Dana 60 front axle for a friend. He had already ground out the welds, but things were still pretty tight. Unfortunately, the press wasn't quite tall enough the fit the axle so we needed the ''Press Height Extender''. It took everything the press had and some heat from the rosebud to press them off. At least I know it will press the full 50 tons.

IMG_0028.jpg
 
The project has taken a couple of days. A friend made a new crystal for a 2" dial indicator that I've had for several years. The indicator has a dovetail on the rear of the case that's much wider than those on the usual small dial test indicators. I needed to make a holder for the dovetail. Since I don't have a small dovetail cutter, this was perfect territory for my South Bend shaper. On day one, I ground the tool bit for the dovetail. Since the holder I'd be making was round, it wouldn't be easy to turn the part 180º in the shaper vise to do the opposite dovetail. Thus, I needed to grind tool bits for both left and right dovetails. I did this using my tool and cutter grinder with a Hammond vise obtained from another member of the site. 01 Grinding dovetail tool (Large).JPG 02 Grinding relief on dovetail tool  (Large).JPG 03 Completed dovetail tool & diagram  (Large).JPG
 
On day two, I machined the holder for my 2" tenths indicator with the dovetail on the back. It was the first real project for my shaper. I used a cutoff tool to make the slot in the end of the 1/2" dia bar. Then I cut the dovetail on each side. The first dovetail was too loose, so I turned it off on the lathe and did it again. Despite shapers having a reputation as being slow, making the dovetail actually went fairly quickly, even with the shaper on its slowest speed. I learned after the fact that when doing the dovetails I should have had my clapper box angled instead of in line with the tool slide. In this case it didn't seem to make any difference, but the reason is to provide clearance on the back stroke. I see there's a photo limit per message, so I'll post the photos of the completed holder in another message.08  Cutting the slot  (Large).JPG 10 Cutting the dovetail  (Large).JPG 11  Cutting the dovetail  (Large).JPG 14 Cutting dovetail on the opposite side  (Large).JPG
 
This is the final installment on my indicator holder project showing the completed holder and how it works. The metal was some hot rolled steel from the scrap box. The points of the dovetail were pretty sharp so I hit it with the wire wheel and it's more "pleasant" to handle now. The long screw in the back was the only 10-32 brass screw I had long enough to go through the stem of the holder. Hmm. Although I only uploaded one copy of each photo, in this message, I'm seeing the whole series a second time. Looks like there are still some bugs in the new software.15  Complete indicator holder  (Large).JPG 16 Holder attached to indicator  (Large).JPG 17 Holder attached to indicator  (Large).JPG 19 Dovetail holding dial indicator (Large).jpg 20  Indicator in magnetic base  (Large).JPG 16 Holder attached to indicator  (Large).JPG 17 Holder attached to indicator  (Large).JPG 19 Dovetail holding dial indicator (Large).jpg 20  Indicator in magnetic base  (Large).JPG 15  Complete indicator holder  (Large).JPG 16 Holder attached to indicator  (Large).JPG 17 Holder attached to indicator  (Large).JPG 19 Dovetail holding dial indicator (Large).jpg 20  Indicator in magnetic base  (Large).JPG
15  Complete indicator holder  (Large).JPG
 
Not machining related but I had a job at home I have been working on for the past several nights, late I might add.

I had to take a slight deviation from my utility trailer project. I have had so many personal projects that need to be done I have been trying to fit them in between the paying ones and time has been at a premium. My full-time job has been so hectic with new managment, I have been putting in 12+ hour days at work and then working until around 8:ish at night. Then start over @ 4:00 am and do it all over again. I really hope to get caught up at home and get our new management team settled in at work so I can relax and enjoy my summer. My wife and I have a lot of fun trips planned and so far I am stressed out wondering if we will be able to relax and enjoy them.

Anyway, the weather had been holding out thus far and I have been needing to put new tires on our 2003 Monaco Dynasty motorcoach. I have NOT been happy with the POS Goodyear G670 that were on the coach one bit. They have developed an irregular wear pattern and I thought I would have an alignment done prior to installing my new Michelin's.

The alignment was within spec but to the high side of the allowable thrust angle of the drive axle. Monaco Roadmaster rear suspensions are not adjustable, as many other heavy RV chassis are either. The guy who performed my lazer alignment told me he wouldn't do anything with it as it was within the allowable range. That isn't me. Between he and I we calculated that the driver's side drive axle needed to move forward just under .125" and the tag axle slightly less than that.

On many heavy OTR trucks they use adjustable ends on their suspension links and Volvo uses an ecentric that allows for some slight adjustment. I thought about drilling the holes out and machining some ecentrics but wasn't sure if I wanted to lose any material on the chassis mounting points as well as several of them would be difficult to get a drill in due to space limitations.

Again, the gentleman who did the alignment suggested leaving it if there were no adverse handling issues. My wife and I like to travel mainly on two lane country roads when we travel and I notice that due to road crown the coach does drift off slightly when letting go of the steering wheel. On concrete interstates it is fine. I opted to move the driver's side forward .125" so it will actually help to hold to the road crown a bit.

First off, the reason for all this. Baby gets new shoes. Michelin XZA2 Energy tires in a 295/80R22.5 size. I am replacing all four drive tires, taking the two best tires from the drive axle and moving them to the tag axle and I will also be putting two new steer tires on. Good thing I am done paying for my son's college because there went a years tuition.
2a9vgo9.jpg

2ewoebm.jpg

Here are the two trailing arms (control arms) that I will be removing to lengthen. Upper and lower on driver's side. Don't worry, all the weight of the coach is NOT sitting on those two jackstands under the hub. I have my 20-ton jackstands under the rear of the frame and those two 6-ton jackstands are merely holding the weight of the drive axle because I dumped the air out of the rear suspension to allow some movement of the axle.
iy0ohs.jpg

Make-shift jig setup on my welding table. I clamped some large tubing down so I could make two borders to hold the trailing arm, take some measurements, cut and then insert the trailing arm back into the jig and clamp it to the correct length.
oqx3br.jpg

Cutting the trailing arm in my horizontal bandsaw.
hvbc45.jpg

I had measured the outside diameter of the square tubing of the trailing arms and had prepared for two separate methods of sleeving the trailing arm. I dug through my steel supply and found a piece of trailer hitch receiver tubing left over from one of the various trailer hitch projects. This measures 2" inside diameter and would work to sleeve the outside of the trailing arm. I was really hoping that the 2" square tubing that Roadmaster used for the trailing arms was .250" wall thickness because I also had a few small pieces of 1.5" O.D. x .250" wall square tube in my scrap bin. This would be my preferred method which would allow me to sleeve the trailing arm internally keeping the outside dimension the same as OEM. Not that sleeving it externally would be any weaker or stronger, just that I wanted to keep the trailing arm as near OEM appearance without sacrificing strength as possible.

All the planets were in alignment, the wall thickness of the trailing arm was .250" so I was able to use 1.5" square tubing to sleeve internally.:rocker:
2eq3vb5.jpg

I then went one step further and put the trailing arm back into the horizontal bandsaw and removed a .125" sliver of steel. This will allow me to have just enought of a gap in the joint to allow full penetration and let the weld bite hard into the inner sleeve as well as both halves of the trailing arm for a very solid link. In addition, I knew there would be some shrinkage or pull back putting that much heat and weld into the trailing arm. I actually set the overall length @ .156" thinking it would pull back approx. 1/32" upon cooling.
5mil2s.jpg

I also drilled a few .500" holes in both halves of the trailing arm to allow me to rosette weld (plug weld) the inner sleeve to the trailing arm. Root weld and rosette welds completed. For some reason I don't have any pictures of the internal sleeve but there is a 6" length of 1.5" square tubing inside the trailing arm.
2rr4ftt.jpg

While I was waiting for the root weld to cool slightly I decided to grab some polish and run a coat of polish around my wheels.
f3cf4j.jpg

When my wife and I bought the coach in 2007 the previous owner had neglected the wheels badly. I don't think they had seen a coat of polish in their first four years. Upon our purchasing the coach, I removed all the wheels and polished them with a compounding pad using tripoli and jewelers rouge bringing them back to nearly new shine. Now once or twice a year I merely have to run around them with a coat of Busch's Aluminum polish and they look amazing and bead water off nicely.

I then moved on to complete to top pass on the trailing arm.
dwv3f5.jpg

After cooling I threw it back into the jig to test for the final measurement. Dead nuts on @ 1/8" over the starting length. It shrunk back exactly where it needed to be.:rocker:
imknes.jpg

After cooling I applied a heavy coat of chassis paint, installed the lower trailing arm, removed the upper trailing arm and performed the exact same procedure. Here is the upper trailing arm completed and ready for paint.
5btz4g.jpg

Moving on to the final pics of the modified trailing arms and wheels/tires installed.

Here is the upper trailing arm completed, painted and installed.
2ijj6ad.jpg

Here is the lower trailing arm completed, painted and installed.
2r5fecm.jpg

Inner dual installed, Balance Master installed, Crossfire installed and torqueing the wheels on with my Proto 3/4" drive torque wrench. Yes that is snow that is starting to fall that you see on the ground. It started just as I crawled out from under the coach from tightening the last two bolts on the tag axle trailing arms.
2s9585u.jpg

View of completed project. You can see how much better it looks after all that work.:lol:
nzog02.jpg

2ymt4cj.jpg

All in all, I am glad that job is done.

I set up an appointment for another alignment to verify the success of the modification for Wednesday afternoon. I am glad to say that the alignment is dead on the money. The guy doing the alignment was very impressed with the method in which I altered the suspension and impressed with how accurate it turned out. As was I, very happy it is dead on. I took it for about a 15-mile test drive the other night and it doesn't even feel like the same coach.

Mike.
 