- Joined
- Apr 23, 2013
- Messages
- 1,015
I am so old school I started in a machine shop on a brand new 11 inch Logan with a cross slide
with a tool post in the front side and another post in the back side. With production work we often timed tools. Timing tools meant facing part with front tool and using the same stop we might put a groove tool in the back to hold length from face of part to the groove location. There were times we would time 2 or 3 tools at a time.
Jim
with a tool post in the front side and another post in the back side. With production work we often timed tools. Timing tools meant facing part with front tool and using the same stop we might put a groove tool in the back to hold length from face of part to the groove location. There were times we would time 2 or 3 tools at a time.
Jim