Thanks for the info. I believe you can have it come up through the floor but has to be in conduit or tapped. Before concrete is poured I should have it figured out. The inspector so far has not answered my questions and is very slow to respond to my emails. Busy I'm sure but.....
The three 90's, or two, are not required here as my house service is a straight shot of soft 1/2" copper.
The three 90's, or two, are not required here as my house service is a straight shot of soft 1/2" copper.