New shop, ground-up build (advice and discuss details)

Before and after. Yardwork is bottom priority for me, apparently.
613920b8e3ba82839c6a2533c9d9b1c6.jpg
d87da37c430cb7555c53daab62087c36.jpg
c764fab97379a06cefc62fd5d275939f.jpg
ef421ab7ed5e9858d5357b3641b2a811.jpg
 
Some progress... 2 weeks to completion! Then fencing, followed by finish grading, concrete curing, floor epoxy, 2-post lift install, insulation and electrical, mini split... Then I can move in and play with my toys.
3e0eb0938186ff31319f57e9c1cee4ce.jpg
282add964271f74bf32eae2467a2ea27.jpg
 
More progress! The second story floor will be 13' above the concrete pad. That fits a lift without issue.
0eb9e22ab92226a89b59415bafdc6fcc.jpg
6b7d4db2526390e1e2c73c416c59fc0d.jpg
342bfdbb6cae02a2ba4d038b10a952bc.jpg
 
sooooooo jealous!
-brino
 
That is an awesome space. Looking good


Sent from my iPad using Tapatalk
 
I'm drooling a little bit.
 