- Joined
- Dec 19, 2018
- Messages
- 130
Think i'll start a thread going through the setup process. So phase I was to get it off my trailer and into my shed and up on my motorcycle lift table for uncrating. I though this was going to be a PIA but with some rigging straps and my hand winch and my ATV ramps the transition from trailer to table went very smooth and quick. Phase II is inspection and correcting the typical China poor assembly. Already spotted several issues that need correction. #1 is the cog belt alignment is way off , easy fix just needed to remove a spacer behind the upper pulley and now all the belts align nicely. #2 is the thread dial indicator is skipping, and that just needed to be loosened and adjusted to better mesh with the lead screw. Spent today with the spindle break-in. Tomorrow I start to disassemble and clean. Lots of oily grit everywhere.