Awhile ago, I made a bagger setup for my large walkbehind mower, and as part of it, there are two support braces that go on little stubs I welded to the mower's frame, with an r-pin to hold the brace on the stub.
But I had to move those stubs because the supports for the new air cleaner I installed are right in the way of the braces if I left them there. So, I cut the stubs off and welded them to the air cleaner supports. This actually turned out better than before, because now I could weld the stubs on at my workbench, so the pieces could be horizontal, vs welding them on the frame (the surface is vertical, so I have to weld vertically and underneath).
As well, I had to fix the braces, as the distance between the two 'stubs' they go onto is about an inch closer. As well, I decided to get fancy and do the braces like the OEM ones were, and bend & support the braces between the two stubs on each side are offset from each other (the pics show how they are offset).
As a bonus, with the new air cleaner setup, I've noticed that the motor actually seems to start easier. Before it seemed to always need a couple of tried with the choke on, and with a couple of seconds of cranking before it starts, but the couple of times I've started it with this new air cleaner, it's started almost immediately on the first try. I'll see if it's just playing with my mind or if it's for real over the summer...