Something simple but necessary

matthewsx

H-M Supporter - Diamond Member
H-M Lifetime Diamond Member
Joined
Jan 2, 2019
Messages
7,163
Looking back at my content I see that on July 1 2021 I asked about this gear that was stripped on my lathe and needed replacement.

IMG_9685.jpg

Well, I bought one from Grizzly that didn't work and ended up getting the right modulus and pressure angle from McMaster-Carr but it needed to be bored and faced. I chucked it up in the 4 jaw and started but got sidetracked somehow.

Finally got around to finishing the job today and now my gearbox has drive :)

IMG_0481.jpg

I know it might not look like much for most folks but to finally have a fully functional machine is kinda special to me. Now on to some other projects....

John
 
My projects always take much longer than planned and wanted.

I know the feeling of actually finishing something......finally!

Brian
 
Getting a machine back operational!!? One of the best feeling in the world! Congratulations.
 
I know the feeling. I just got the Z axis scale installed on the mill this past Saturday. with that, I have the DRO project done within the five year deadline. Barely. Next I have to finish installing the coolant system. That's only been going for five months... plenty of time still.
 
Next I have to finish installing the coolant system. That's only been going for five months... plenty of time still.
ISTM, a coolant system is not something you'd want to make a mistake on, :eek:
so, yeah, take your time! :)
 
That seems like pretty severe damage...without naming names, do you know how it happened? Maybe save a gear out there for somebody.
 
Back
Top