Some more cast iron mig welded.

aametalmaster

Registered
Registered
Joined
Sep 23, 2010
Messages
619
This is a heavy 10 lathe part that Nelson sent me years ago and the corner was broke out. I layed a copper mig nozzle in the hole and mig welded it up. Total welding time 30 seconds. Ground it off and drilled out the copper slug. I wanted to keep that cast look with the rounded corners like the other side. Thanks Nelson...Bob

projects 100.jpg projects 101.jpg projects 102.jpg projects 103.jpg projects 104.jpg projects 105.jpg
 
Back
Top