Continuing on this project (previous post: https://www.hobby-machinist.com/thr...d-you-do-in-your-shop-today.14637/post-563041)
Connected the rectangular flange to the round one. Used 1.5x1/8" strips until I ran out of it, then some ~1.25x1/8" (from cutting down the width of a long piece of 8x1/8" for another project), and finished up with some 1x1/8" strips.
Warning: the welding is....uh....not particularly good...
Partly done:
Done:
Mounted on the blower:
Original Chute (it's been cut down about 8" already to make it more usable with the bagger system on the walk behind mower):
Tomorrow I have to massage it a bit with a prybar, as all that welding has pulled the two end flanges out of round/rectangular a little, and grind/re-weld it so it looks nicer. The inside turned out pretty smooth, which is good as debris will catch on rough points and then start building up over time.
Connected the rectangular flange to the round one. Used 1.5x1/8" strips until I ran out of it, then some ~1.25x1/8" (from cutting down the width of a long piece of 8x1/8" for another project), and finished up with some 1x1/8" strips.
Warning: the welding is....uh....not particularly good...
Partly done:
Done:
Mounted on the blower:
Original Chute (it's been cut down about 8" already to make it more usable with the bagger system on the walk behind mower):
Tomorrow I have to massage it a bit with a prybar, as all that welding has pulled the two end flanges out of round/rectangular a little, and grind/re-weld it so it looks nicer. The inside turned out pretty smooth, which is good as debris will catch on rough points and then start building up over time.