- Joined
- Oct 16, 2017
- Messages
- 341
I used the stock hub from the PM935. Installed it in the super spacer, tilted the mill head and lined up on the original hole and then drilled and tapped the other two holes at 120 and 240. The handles are 303 and the knobs are phenolic from McMaster. I had to turn down the knobs to remove the casting seam.