- Joined
- Jun 19, 2017
- Messages
- 83
Hey guys, it's been a long time since I've been on here.
September 1st, I ordered a PM-940V with the power down feed and a 3 axis DRO installed.
The site says lead time "late fall".
Before I placed my order I called them to ask if they can narrow that down at all.
Now, I can't exactly remember what the guy said but it amounted to a NO.
Has there been any chatter about them doing a fall order and when anything might happen?
Thx,
Jim
September 1st, I ordered a PM-940V with the power down feed and a 3 axis DRO installed.
The site says lead time "late fall".
Before I placed my order I called them to ask if they can narrow that down at all.
Now, I can't exactly remember what the guy said but it amounted to a NO.
Has there been any chatter about them doing a fall order and when anything might happen?
Thx,
Jim
Last edited: