- Joined
- Jul 15, 2020
- Messages
- 422
I recently struggled with how I might lift my newly acquired Bridgeport off its pallet and move it into position. I finally solved the problem by sliding the front off the pallet and mounting leveling feet/casters, then doing the same with the rear of the machine. This also fixes the issue of a substantial slope in my garage floor near the walls.
H&W Machine sells a kit that uses solid bars across under the front and back of the machine, with leveling feet at the ends. My approach was similar, but I used 5" x 2" 1/4" wall rectangular tubing with leveling feet that have integral casters. Since the machine is now 7" taller, I bought a 7" high work platform. The stability is increased with the wider stance.
H&W Machine sells a kit that uses solid bars across under the front and back of the machine, with leveling feet at the ends. My approach was similar, but I used 5" x 2" 1/4" wall rectangular tubing with leveling feet that have integral casters. Since the machine is now 7" taller, I bought a 7" high work platform. The stability is increased with the wider stance.