I'm machining some shafts for a gearbox that I'm getting splined by a shop (I dont have the tools or the know-how), and was wondering how much material to leave them for splining. For an external spline should I turn them down to the final major diameter of the splines or do I need to leave some extra material? Same goes for internal splines. Any help would be much appreciated!
Cheers
Cheers