G0759 Vs Pm25

PM25 or G0759

  • PM25

    Votes: 5 100.0%
  • G0759

    Votes: 0 0.0%

  • Total voters
    5

mwest

Registered
Registered
Joined
Mar 1, 2015
Messages
12
Hello,
I have had a G0759 on order since January and I am considering cancelling my order due to continued shipping delays. I contacted Precision Matthews and they have a PM25 with 2 axis DRO that can ship in May.

I have never used a milling machine before. I am planning on using the machine manually as a learning exercise and will eventually convert to CNC.

My question is will I miss the third axis DRO?

Thanks,
Matt
 
I don't know these machines...

My mills has a two axis DRO. I put a very inexpensive quill digital scale for Z axis. All I've ever needed.

Karl
 
Matt - I am in the same boat actually. Considering either a G0704 or PM25V. I think both models come standard with a Z quill DRO. So, my guess is that you'd have all 3. Just not on the same readout. I would think Z is the primary requirement, but already built into the PM25V. But, I think this just reads the quill movement. Maybe someone with a PM25 would be better to chime in to confirm.
 
I'm impatient (usually), so if it were me and I didn't care which one I owned, I'd cancel and order the one in stock.
 
I have a PM-25MV with a three axis DRO that I installed. In addition the machine does with a quil DRO. The DRO install is not hard to do if you are familiar with basic hand tools like a drill, transfer punch and rule. I made custom brackets for mine and had fun doing it. As far as the mill goes I believe Matt offers a better product than Grizzily. He has great service and really works hard to make his customers happy. I too ordered a G0759 and cancelled after shipping delays and bought a PM. I am glad I did. Matt includes the belt drive, brushless motor, three bolt head, and a three year warranty.
 
If the plan is to go CNC then dro won't be used. You could spend the money on outher things.
 
Matt,

When exactly in January did you order? I ordered my January 15th and got it on March 18th. I wonder if you got bumped to the next batch? I know several other folks here got one within a few days of me.

Anyhow, I am happy with the G0759. I very pleased with the DRO and the machine overall.

Jim
 
Thanks guys,
My Grizzly order went in January 23rd. I cancelled it last week. Over the weekend Matt had an order get updated for a larger Machine and was able to offer me a PM 25 with a 3 axis DRO. So I placed an order with Precision Matthews today for a machine that is currently in Pittsburg. Once it passes inspection it will ship out to me.

Cheers,
Matt
 
Matt, did your PM-25 arrive? Maybe you'll give an update, un-crating, set-up, etc. post? Would be cool.
 
Last edited by a moderator:
Hi Swarf,
The machine arrived a week ago Monday. I just returned from out of town yesterday evening. I hope to uncrate it this week. Unfortunately my weekend days are already committed for the next three weeks so this could be a slow process.

Cheers,
Matt

Uncrated the machine this evening. Was simple process that only took about 30 minutes. Spent the rest of the evening trying to read English as a second language translations of manuals for the milling machine and dro.
 
Last edited:
Back
Top