This is the second melt from the furnace. I have modified the furnace by adding exterior sand insulation, adjusted the torch position and increased the gas flow since the first melt. I can now melt 40 cubic inches of Al in less than 25 minutes. This is enough to cast a 2"x2" by 10" ingot for machining with some left over.
Pot's right:
Furnace:
Heating:
Ingot poured and left over melt poured into the funnel leading to a cylindrical hole in the ground:
Completed ingots:
Cutting, turning and milling the ingots:
Completed highway peg mount for BMW, the final finish was sanded to rough it for potential powder coating:
Supervisor approves;
Pot's right:
Furnace:
Heating:
Ingot poured and left over melt poured into the funnel leading to a cylindrical hole in the ground:
Completed ingots:
Cutting, turning and milling the ingots:
Completed highway peg mount for BMW, the final finish was sanded to rough it for potential powder coating:
Supervisor approves;
Last edited: