Bought my mill RF 30 clone, about three weeks ago and today was the first time operating it. Did not make anything, just cleaned/ trued up some steel plate, allowing me to focus on the general set up and operation processes, check out the DRO and get myself familiar with the mill. Slow and Safe... baby steps
The past few weeks I have been busy getting the mill set up the way I want it. Built a riser to install between the mill base and floor stand, raising the working height of the table 10". Made up some brackets and mounted the linear scales/DRO.. It is amazing how long some of the simplest things take to fabricate and set up. Now that I have the mill set up with the DRO I will slowly work towards fabricating a more clinical looking Z axis one piece mounting bracket.
I still have to fabricate some parts for the auto feed that I got with the mill, as some items in a normal kit were not included.
The past few weeks I have been busy getting the mill set up the way I want it. Built a riser to install between the mill base and floor stand, raising the working height of the table 10". Made up some brackets and mounted the linear scales/DRO.. It is amazing how long some of the simplest things take to fabricate and set up. Now that I have the mill set up with the DRO I will slowly work towards fabricating a more clinical looking Z axis one piece mounting bracket.
I still have to fabricate some parts for the auto feed that I got with the mill, as some items in a normal kit were not included.