It's here!
The driver backed up to my shop overhead door, put the crate on the lift gate, lowered it to about an inch off the ground, then backed the left gate and crate right into the shop.
He wheeled it off the lift gate with the pallet jack, and set the crate right next to its new permanent 'spot'.
I spend a few hours making s base for it, lifting it 7". I know the wood base looks a little sketchy on the outside, but on the inside it's not. The 4 corners have thick hardwood pads on the inside that the machine sits on, transferring the load directly into the concrete and spreading it over 100 square inches of concrete.
Here it is level and on the floor.
Now I'm shopping for a vise. I'm kinda leaning toward a Glacern, but not sure if I want a 5 inch or a 6 inch.
Anyone have pics of either size? How much does a 6" hang over the back of the table?