- Joined
- Dec 11, 2014
- Messages
- 891
Well, got back this afternoon from Springfield with my new G0704 Mill.
Got it uncrated, bolted down to the stand and concrete floor.
Still need to level it. Checked it with my 12" Starrett across and with the table and it's off a little.
Cleaned all of the shipping gunk off and decided to take a few pics to finish off a long day.
I'll work on leveling it tomorrow. Then check everything out and adjust the gibs before I fire it up.
Got it uncrated, bolted down to the stand and concrete floor.
Still need to level it. Checked it with my 12" Starrett across and with the table and it's off a little.
Cleaned all of the shipping gunk off and decided to take a few pics to finish off a long day.
I'll work on leveling it tomorrow. Then check everything out and adjust the gibs before I fire it up.