Just learning 360 and made a little part to figure things out.
One side looks ok considering I stopped and started this job over and over.
The second side tho is really bad looking.
I did 2D adaptive to clear the bulk came back to finish the last .020. I split the .020 into 3 passes at full depth climb milling so probably stepover of about .007 on .375 endmill.
Ideas?
One side looks ok considering I stopped and started this job over and over.
The second side tho is really bad looking.
I did 2D adaptive to clear the bulk came back to finish the last .020. I split the .020 into 3 passes at full depth climb milling so probably stepover of about .007 on .375 endmill.
Ideas?