- Joined
- Sep 2, 2013
- Messages
- 5,055
Have been doing prep for interior finish, interior walls, door openings, nailers, etc.. Put up 5/8 osb for Pro-Panel wainscoting on the first four ft of the interior walls in the machine shop, and welding/fab areas. Increased the the size of the machine shop from 10x20 to 15x20. That means the welding/fab area has shrunk by an equal amount, but if I have something over sized I can move out into the main shop area if needed. The back/neck brace hopefully comes off in three weeks and the pace should pickup some. Cheers, Mike